JYOTI ENGINEERS & CONTRACTORS PVT. LTD.- GONDAL

DETAILS OF MAJOR PROJECTS ON HAND FOR  TRANSMISSION LINES & Sub Station

 

Sr. No.

NAME OF LINE

 

ORDER REFERENCE NO. & DATE.

LENGTH IN  KMS

DATE OF COMPLETION

Client

STATUS IF ORDER UNDER EXECUTION

1

Supply ,Erection & Commissioning  work of 220 KV Gangapur- Chhadvel- Satana line (Suzlon)

W.O. no. 4500050046 dated 30.03.2007 &
W.O. no. 4500058721 dated 01.08.2007

104

6 Month form the Date of LOI

 

Suzlon Energy Ltd- Pune

Foundation & Erection work is completed.

(The work is under the supervision of MSETCL according to their specification)

2

Supply, Erection, testing & Commissioning of 66 KV Ahwa- Saputara  line.

CE(Pro)/II/66 KV N-N/S & E/2083/T-3/3377 & 3376 both dated 22.04.08

26

Six month from the date of W.O.

Gujarat Energy Transmission Corporation Ltd.- Baroda

Survey Work is started

3

Supply, erection, testing & commissioning of 220 KV D/C Zebra Conductor on D/C Tower line from Adwadi (Sinnar-II) S/s to Babhaleshwar (MSETCL) S/s. 

W.O. no. 4500087955 dated 16.05.08

55

Six month from the date of W.O.

 

Suzlon Power Infrastructure Pvt. Ltd.- Pune

The work is in progress.

6

Supply & Erection work of 220 KV Utran- Kosamba D/C Transmission line on D/C towers on Turnkey basis.

W.O. No. CE (Proj)/II/220 KV/ S & E/ 2090/U-K/T-3/8397 dated 5.11.08

86

--

Gujarat Energy Transmission Corporation Ltd.- Baroda

The work is in progress

7

Supply & Erection Work of 220KV M/C LILO at Bhat From Salejada-   Viramgam D/C Transmission Line – 17.194 KM on Turnkey Basis.

A/T no/ CE (Proc)/III/220 KV LILO/ S-V/S&E/2094/T-1/425 & 426 dated 13.01.09

17

--

Gujarat Energy Transmission Corporation Ltd.- Baroda

The work is in progress

8

Supply & Erection Work of 220KV Salejajada-   Viramgam D/C Transmission Line – 62 KM on Turnkey Basis.

W.O. no. 1) CE (Pro)/II/220 KV/S- V/S &E/2093/T-1/111 dated 2.01.2009  (Supply Portion)
2) CE (Pro)/II/220 KV/S- V/S &E/2093/T-1/195 dated 2.01.2009  (Erection Portion)

62

--

Gujarat Energy Transmission Corporation Ltd.- Baroda

The work is in progress

9

Supply & Erection of 220 KV Sardargadh- Motipaneli line

EIL/JECPL/220 KV/03-08

37

Six month from the date of W.O.

Enercon India Ltd- Baroda

The work is in progress

10

Package – A2 for 400kv D/C (Triple bundle) Adullapur- Sonepat transmission line associated with system strengthening in NR GRID for Karcham- Wangtoo.
( Power Grid Corp. of India Ltd. – Gurgaun)

Supply & Erection Order: C-22703-L195A-3 /LOA-I/2866 & 2867
dated: 18-02-09.

75

21 Month from the date of LOA

 

Power Grid Corp. of India Ltd. – Gurgaun

The work is in progress

 